Explore

Case Studies

Floor Repair: Re-level & Reinstate Integrity

Client

Major North Sea Operator

Location

Offshore Platform, North Sea

Case Study

Project Overview

Altrad was engaged by a North Sea operator to restore the structural integrity of the flooring within the accommodation module of an offshore platform.

The Challenge

Following an unsuccessful attempt by a previous vendor to re-level and repair the accommodation flooring, Altrad was engaged to develop and implement a reliable solution. The objective was to restore deck integrity and achieve a level surface across two accommodation rooms, enabling the finishing contractor to proceed with furnishing.  

The repair was essential to halt ongoing corrosion and ensure a safe, durable foundation for continued use.

The Solution

A tailored repair solution was developed using a self-levelling screed that eliminated the need for mechanical surface preparation. The team hand-abraded the area, applied Belzona to treat localized pitting, and installed fabricated SMW flashings around the perimeter.  

Finally, ARDITEX NA was poured and levelled to achieve a smooth, durable finish suitable for subsequent furnishing activities.

The Benefits

  • Improved Structural Integrity
  • Reduced Downtime
  • Cost-Effective Solution

Published

June 26, 2026

Contact Us

Let’s start the conversation.

Quite simply, a journey at Altrad begins with a desire to create a better tomorrow.

Case Studies

Explore our featured projects to see how we help clients achieve successful outcomes across every stage of delivery.

What We Offer

We transform our clients' ambitions into reality. Our highly skilled teams deliver projects with a lasting, meaningful impact, providing a full spectrum of solutions and services tailored to meet any requirement.

Solutions.

Complete asset support.

From the initial spark of an idea right through to the final stages, clients have access to a complete range of asset solutions. Every single step of the project lifecycle is fully supported, ensuring the exact requirements for success are met.

Five workers in yellow and red safety gear walking near industrial metal scaffolding.

Services.

Excellence through expertise.

Dedicated professionals are deployed across a wide range of specialised services to support project delivery. Whether you require individual technical experts for targeted solutions or a multi-disciplined team for comprehensive project support, we provide the right expertise and resources.

Worker in yellow safety jacket and white helmet adjusting industrial equipment with cables and connections.

Case Studies

See our impact in action. Explore our featured content to see how we deliver results.

Case Study

06/2026

Fabric Maintenance Multi-disciplined Teams

Case Study

06/2026

Mechanical, Electrical & HVAC Alliance

Case Study

06/2026

Lifetime Enterprise Agreement

Case Study

05/2026

Alustar Aluminium System Scaffold