Explore

Case Studies

Cold Cutting Operations

Client

Repsol Sinopec

Project

Cold Cutting

Location

Bleo Holm FP50

Case Study

Project Overview

Altrad’s Specialist Services had been requested to carry out the deconstruction of the Bleo Holm FPSO Methanol Storage Tank (Tag No. 540-T-6615) with assistance from client scaffolding and rigging departments.

The team carried out Ultra High Pressure (UHP) Abrasive Water Jetting Operations / Cold Cutting to cut the tank / vessel into removable sections allowing onshore waste disposal.

The Solution

Altrad Services Supervisor discussed the work scope and all of the associated risks with the FPSO operations team, all hazards and risks within the Repsol Sinopec. ISSOW Level One Risk Assessments were discussed in detail and controls were put in place with an agreement from the FPSO operations team and safety department. If unforeseen risks identified, the project must not go ahead until appropriate control measures have been agreed.

The information within the Altrad Services work pack and associated procedures were communicated to all personnel involved within the work scope; all parties signed under section seven of this work pack to confirm content and method had been accepted by all.

All personnel involved in the task were brought up to date with the proposed activity and contingency arrangements. All Altrad Services and platform personnel involved with pre-start shift toolbox talks were recorded through signatures on the Toolbox Talk Record Form.

If unforeseen hazards were identified during the toolbox talk the project would not have gone ahead until all hazards had been reassessed and recorded on the Altrad Services Job Specific Risk Assessment. Additional hazards will also be included within the Repsol Sinopec ISSOW Risk Assessment.

The Altrad Specialist Services Supervisor liaised with the FPSO deck foreman to discuss all the access and laydown requirements for our team, plant and equipment.

All personnel were appraised of the Repsol Sinopec UK Safe System of Work, the permit to work system and participate in the Task Risk Assessment. All work was completed in accordance with Altrad Specialist Services/Client Safety Management Systems.

The Benefits

Upon completion of the work the Bleo Holm FPSO Offshore Installation Manager stated the following;

“Can I just pass on my sincerest thanks to you for supervising a job very well done and mostimportantly incident free by all concerned. I walked by a few times, and you have all done a great job, and the area has been left spotless. An example to all of us of how a job should be planned and carried out. Well done, and please pass on my thanks to the team again.”

Published

July 26, 2026

Contact Us

Let’s start the conversation.

Quite simply, a journey at Altrad begins with a desire to create a better tomorrow.

Case Studies

Explore our featured projects to see how we help clients achieve successful outcomes across every stage of delivery.

What We Offer

We transform our clients' ambitions into reality. Our highly skilled teams deliver projects with a lasting, meaningful impact, providing a full spectrum of solutions and services tailored to meet any requirement.

Solutions.

Complete asset support.

From the initial spark of an idea right through to the final stages, clients have access to a complete range of asset solutions. Every single step of the project lifecycle is fully supported, ensuring the exact requirements for success are met.

Five workers in yellow and red safety gear walking near industrial metal scaffolding.

Services.

Excellence through expertise.

Dedicated professionals are deployed across a wide range of specialised services to support project delivery. Whether you require individual technical experts for targeted solutions or a multi-disciplined team for comprehensive project support, we provide the right expertise and resources.

Worker in yellow safety jacket and white helmet adjusting industrial equipment with cables and connections.

Case Studies

See our impact in action. Explore our featured content to see how we deliver results.

Case Study

06/2026

Fabric Maintenance Multi-disciplined Teams

Case Study

06/2026

Mechanical, Electrical & HVAC Alliance

Case Study

06/2026

Lifetime Enterprise Agreement

Case Study

05/2026

Alustar Aluminium System Scaffold