Project Overview

Altrad was asked to clean a 1.8km Brine mud pipeline by Inovyn. The 6” nb pipeline was fouled with a significant quantity of calcium scale (mainly Calcium Carbonate) reducing its internal bore to approx. 3”. As the pipeline is buried under farmland, high pressure water jetting could not be performed because there were not sufficient access points.

The Solution

Chemical cleaning was a viable option to clean the pipeline without the need for extensive excavations. Scale samples were analysed in Altrad’s laboratories to determine the most efficient parameters for cleaning. It was determined that the most efficient method to remove this type of scale is dissolving it in a mineral acid, Hydrochloric Acid was chosen. A successful trial was initially performed at a suitable location, where 100m of the pipeline were cleaned. Following that the whole 1.8 km pipeline was cleaned using inhibited Hydrochloric Acid.

The Process

Two fully bunded pump stations were set up at either side of the pipeline. One side of the pipeline was in the farm fields so the set up was adjusted to ensure each flange joint was placed in a suitable chemical bund to eliminate the risk of contaminating the ground. The area was barriered with temporary heras fence to prevent unauthorised access and labels were posted. Three vent points were identified at high point location along the pipeline and IBCs with alkaline solution were installed so any gases/liquid produced during venting were captured and neutralised.

Before commencing the chemical cleaning, the Environmental Agency audited the set up; the outcome was successful with one minor observation that was rectified by Altrad.

High head centrifugal pumps were used to pump the acid solution from one side to the other several times, topping with acid as required to maintain the decided concentration of acid in the solution. Once the chemical cleaning was completed the pipeline was neutralised using a 0.5% Sodium Carbonate.

The effluent was neutralised and disposed at an EA licensed waste disposal site.

Client Testimonial

“The project was finished on time and to a high standard. Altrad have maintained excellent standards throughout the project”

Philip Hughes, Inovyn

‍

Published

July 27, 2026

Contact Us

Let’s start the conversation.

Quite simply, a journey at Altrad begins with a desire to create a better tomorrow.

Case Studies

Explore our featured projects to see how we help clients achieve successful outcomes across every stage of delivery.

What We Offer

We transform our clients' ambitions into reality. Our highly skilled teams deliver projects with a lasting, meaningful impact, providing a full spectrum of solutions and services tailored to meet any requirement.

Solutions.

Complete asset support.

From the initial spark of an idea right through to the final stages, clients have access to a complete range of asset solutions. Every single step of the project lifecycle is fully supported, ensuring the exact requirements for success are met.

Five workers in yellow and red safety gear walking near industrial metal scaffolding.

Services.

Excellence through expertise.

Dedicated professionals are deployed across a wide range of specialised services to support project delivery. Whether you require individual technical experts for targeted solutions or a multi-disciplined team for comprehensive project support, we provide the right expertise and resources.

Worker in yellow safety jacket and white helmet adjusting industrial equipment with cables and connections.

Case Studies

See our impact in action. Explore our featured content to see how we deliver results.

Case Study

06/2026

Fabric Maintenance Multi-disciplined Teams

Case Study

06/2026

Mechanical, Electrical & HVAC Alliance

Case Study

06/2026

Lifetime Enterprise Agreement

Case Study

05/2026

Alustar Aluminium System Scaffold