Date
November 2023 – March 2024
Project
Offshore Windfarm Substation in the North Sea
Case Study
Project Overview
Altrad was contracted to design and construct two specific scaffolding structures for use during the installation of an offshore wind farm substation. independent towers for access to overhead cable trays.

The Challenge
The solution had to allow for subsea cables to be pulled across the scaffold deck using integrated winch mounts, with bespoke winch arrangements before being split and routed into termination points on the level above. The structure also had to accommodate independent towers for access to overhead cable trays.
The Solution
Using 3D modelling software, our experts designed a bespoke solution which incorporated cable support rollers and winch mounts both built up from the working platform to facilitate cable pulling and termination works.
The rollers enabled the cable to be effectively pulled in while creating minimal wear and stress to its sheath. The winch mounts, which were designed, fabricated and supplied by Altrad, were incorporated into the structure to pull the cable along the working platform, as the structural steelwork could not be used.
By incorporating winches at specific locations, this ensured accurate cable routing across the scaffold deck. This method also maximised the length of cable on-board at any given time, while not exceeding its minimum bend radius.
In addition to this, two Altrad-designed scaffold access towers and a mobile aluminium tower were provided to allow for the onboard team’s access to overhead cable trays. They also enabled flexibility to access unplanned areas that could not be accessed from the main scaffold structure.
The Outcome & Benefits
- All resources, scaffolding and materials were provided by Altrad
- The scope was completed within the allotted time frame, which involved several operational delays due to inclement weather
- Two bespoke scaffold designs were engineered to account for the slight differences between the two platform’s geometries
- Each design was created with exact parameters, utilising data gathered during the construction phase and on-site surveys as well as, a digital model provided to Altrad by the client. This allowed for easy design workarounds to avoid clashes with structural members and emergency liferaft stations. This can be seen in the 3D rendered images
Published
May 21, 2026
Contact Us
Let’s start the conversation.
Quite simply, a journey at Altrad begins with a desire to create a better tomorrow.
Case Studies
Explore our featured projects to see how we help clients achieve successful outcomes across every stage of delivery.
What We Offer
We transform our clients' ambitions into reality. Our highly skilled teams deliver projects with a lasting, meaningful impact, providing a full spectrum of solutions and services tailored to meet any requirement.
Solutions.
Complete asset support.
From the initial spark of an idea right through to the final stages, clients have access to a complete range of asset solutions. Every single step of the project lifecycle is fully supported, ensuring the exact requirements for success are met.

Services.
Excellence through expertise.
Dedicated professionals are deployed across a wide range of specialised services to support project delivery. Whether you require individual technical experts for targeted solutions or a multi-disciplined team for comprehensive project support, we provide the right expertise and resources.

Case Studies
See our impact in action. Explore our featured content to see how we deliver results.