An Altrad UK client operates a manufacturing and production facility – parts of which have been redundant for several years.
Following detailed surveys, the need to remove sections of redundant systems arose to prevent potential dropped objects from causing harm.
Client
Project
Location
Value
Sections of redundant pipework had begun to show significant signs of corrosion which, if left unchecked, would lead to compromised structural integrity and a potential dropped object risk. A solution was therefore required to safely and efficiently cut, dismantle and remove the redundant pipework.
Prior to Altrad engagement, previous attempts to remove the pipework had been undertaken using cengar saws however, this proved unsuitable due to risk of personnel being exposed to swarf and the lengthy durations experienced in making each cut.
Following a complex rigging operation, Altrad were able to install a clam shell device to enact cold cutting operations whereby ultra high pressure water is mixed with abrasive particles and sprayed on the pipe in a circumferential movement. This ensures cuts are precise and efficient.
The benefits