Current vacancies available in Denmark. | Aktuelle ledige stillinger i Danmark.
The campaign involved the planning and execution of a large-scale inspection programme across the Captain WPP, designed to assess integrity and inform the forward maintenance strategy for the asset.
The scope covered multiple systems and equipment types, requiring the deployment of diverse inspection techniques and specialist personnel. Activities were delivered within a defined operational window, with a strong emphasis on minimising disruption to ongoing operations while ensuring high quality, comprehensive data capture.
Successful delivery was underpinned by close coordination between client teams, inspection specialists and supporting disciplines, enabling efficient execution and timely reporting of findings to support risk based decision making and future planning.
Client
Location
HSEQ
Campaign Date
The campaign presented a range of operational challenges requiring careful coordination and control including:
As the incumbent contractor, Altrad was required to significantly scale delivery capability, including the execution of both conventional and advanced non-destructive testing programmes at pace and volume.

The campaign was successfully delivered within the planned operational window achieving safe, efficient execution and comprehensive inspection coverage across the asset.
This approach ensured the campaign delivered both immediate operational assurance and long-term value to the client.
“Altrad supplied suitably qualified teams and equipment to man the barge campaign shortly after being awarded the contract.
They reacted well to requests for additional personal, extensions to the duration of the campaign and changes to the plan at very short notice.”
Lead Inspection Engineer, Ithaca Energy